New construction inspections are performed at the completion of construction but prior to your final walk-through with the builder’s customer service representative or superintendent. It is always a good idea to verify that utilities (gas, water, and electric) have been turned on by either you or the builder depending on the builder’s policy. The home inspection should be scheduled just a day or two before your final walk through with the builder. This will ensure that most, if not all, last-minute items have been completed prior to your inspection. At the conclusion of the inspection, a completed report will be distributed to you.

Contact Us

Standard Contact Information, Vertical
  • Do not fill this form out if you're a solicitor.
  • This field is for validation purposes and should be left unchanged.